 |
Introduction to CAD Industry |
 |
Drawing Settings |
 |
Orthographic Drawings |
 |
Isometric Drawings |
 |
Perspective Drawings |
 |
Editing the drawings |
 |
Annotations andDimensions |
 |
Layer management |
 |
Project Planning and Management: An Overview |
 |
Selection Methods |
 |
Creating and UpdatingRepeated Elements |
 |
Parametric Drawings |
 |
Preparing Joinery Details /BOM |
 |
Presenting the Project |
 |
Working with a team |
 |
Layout Management |
 |
Scale setting and Plotting |
 |
Import and Export |
|
| Introduction to OrCAD Capture |
|
| Introduction to component database |
| How to place the parts in the design |
| Connecting the parts with wire, bus, net alias and power symbol in the design |
| How to modify the properties of the parts (Property Editor) |
| How to edit the physical appearance of the parts (Part Editor) |
| How to create a new library |
| How to create a new part |
| How to work in Multi sheet projects |
| How to make connectivity between schematic pages |
| How to work in multi folder projectors |
| Working with Hierarchical blocks |
| Design Processing (Annotate, Back Annotate, DRC, Create Netlist, Cross reference parts and BOM) |
| Inter tool communication (ITC) |
| Component Information System (CIS) with Internet Component Assistance (ICA) |
|
| Modifying Schematic for Simulation |
|
| PSpice Netlist creation |
| Error identification and rectification (DRC Markers) |
| Creation and configuration of Simulation profile. |
| Bias Point analysis (To display DC bias values) |
| Transient analysis (Time domain Response) |
| Single Window, Single window with multiple Y-axis, Split window and Multi window representation |
| Parametric analysis (Design response variation with respect to Design element parameters) |
| Temperature analysis (Design response variation with respect to Temperature) |
| DC Sweep analysis (Design response variation with respect to DC parameters) |
| AC Sweep analysis (Design response variation with respect to Frequency) |
| Monte Carlo/Worst case analysis (Design response variation with respect to Device tolerance) |
| Mixed signal simulation (Design and analyzing with both Analog and Digital devices) |
| Macros (Getting response with respect to expressions) |
| Configuring and utilizing stimulus (Signal source creation for Analog and Digital) |
|
| PCB Editor Configuration setup |
|
| How to create customized pad |
| How to create customized Footprint |
| How to create Board Template |
| How to create a new board file |
| How to assign number of layers for routing (X section) |
| How to import the capture logic |
| Component placement (Manual and Auto) |
| Setting up the design constraints (Constraint manager) |
| Routing the design (Manual and Auto) |
| DRC Updating |
| How to Rename design elements (Manual and Auto) |
| Back Annotation |
| How to generate the artwork file (Manufacturing Process) |
| Script File generation and utilization |
| How to import and export design parameters |
|
 |
Instructions to Project Management |
 |
What is a Project? |
 |
What is Project Management? |
 |
Project Management Context |
| Processes of a Project Management |
 |
Initiation |
 |
Planning |
 |
Execution |
 |
Monitoring & Controlling |
 |
Closing |
| Knowledge areas in a Project |
 |
Time Management |
 |
Cost Management |
 |
Scope Management |
 |
Quality Management |
 |
Risk Management |
 |
Human Resource Management |
 |
Procurement Management |
 |
Integration Management |
 |
Communication Management |
|
 |
Activities, Calendars - Definitions, Sequencing & estimate duration |
 |
How to develop a schedule plan and control |
 |
Network analysis-CPM, PERT, PDM |
 |
How to prepare Work Breakdown Structure (WBS) |
 |
How to define WBS |
 |
Constraints |
 |
How to manage cost in a project |
 |
How to do Resource Planning and Cost Estimation |
 |
How to prepare Resource Sheet |
 |
How to apply resource to each activity |
 |
How to define Resource Pool and to allocate Resources |
 |
Filters and Grouping |
 |
How Material Resources are being allocated |
 |
Analyzing Resources and Earned Value Analysis |
 |
Method of developing different types of reports according to industrial needs |
 |
Scheduling in multiple projects |
 |
Customisation |
|