| S.NO |
Course Code |
Softwares |
Duration in hours |
Foundation in Civil CADD |
| 1 |
AEC F01c |
AutoCAD-2D ( civil ) |
80 |
Master Diploma in Land Development |
| 2 |
AEC MD02 |
AutoCAD-2D ( civil ) +AutoCAD-3D ( civil ) +PPM Concepts +Primavera +AutoCAD Civil 3D |
264 |
| 3 |
AEC MD21 |
AutoCAD-2D ( civil ) +AutoCAD-3D ( civil ) +PPM Concepts +MSP ( civil ) +AutoCAD Civil 3D |
264 |
Professional in Land Development |
| 4 |
AEC P02 |
AutoCAD-2D ( civil ) +AutoCAD-3D ( civil ) +AutoCAD Civil 3D |
200 |
| 5 |
AEC P21 |
AutoCAD-2D ( civil ) +PPM Concepts +MSP ( civil ) +AutoCAD Civil 3D |
224 |
| 6 |
AEC P22 |
AutoCAD-2D ( civil ) +PPM Concepts +Primavera +AutoCAD Civil 3D |
224 |
Professional in Building Design |
| 7 |
AEC P46 |
PPM Concepts +MSP ( civil ) +STAAD.Pro +Ansys Civil |
184 |
| 8 |
AEC P47 |
PPM Concepts +Primavera +STAAD.Pro +Ansys Civil |
184 |
| 9 |
AEC P48 |
AutoCAD-2D ( civil ) +STAAD.Pro +Ansys Civil |
200 |
| 10 |
AEC P49 |
AutoCAD-2D ( civil ) +PPM Concepts +MSP ( civil ) +Ansys Civil |
184 |
| 11 |
AEC P50 |
AutoCAD-2D ( civil ) +PPM Concepts +Primavera +Ansys Civil |
184 |
Diploma in Land Development |
| 12 |
AEC D02 |
AutoCAD-2D ( civil ) +AutoCAD Civil 3D |
160 |
Diploma in Building Design |
| 13 |
AEC D29 |
AutoCAD-2D ( civil ) +Ansys Civil |
120 |
| 14 |
AEC D30 |
STAAD.Pro +Ansys Civil |
120 |
Diploma in Civil CADD |
| 15 |
AEC D27 |
AutoCAD-2D ( civil ) +PPM Concepts +Primavera |
144 |
Foundation program |
| 16 |
AEC F03 |
AutoCAD Civil 3D |
80 |
| 17 |
AEC F24 |
Ansys Civil |
40 |
Special Courses |
| 18 |
AEC Spl05 |
AutoCAD-3D |
40 |
Key Topics (AutoCAD)
 |
Introduction to CAD Industry |
 |
Drawing Settings |
 |
Orthographic Drawings |
 |
Isometric Drawings |
 |
Perspective Drawings |
 |
Editing the drawings |
 |
Annotations andDimensions |
 |
Layer management |
 |
Project Planning and Management: An Overview |
 |
Selection Methods |
 |
Creating and UpdatingRepeated Elements |
 |
Parametric Drawings |
 |
Preparing Joinery Details /BOM |
 |
Presenting the Project |
 |
Working with a team |
 |
Layout Management |
 |
Scale setting and Plotting |
 |
Import and Export |
|
Key Topics (AutoCAD Civil 3D)
 |
Introduction to Survey |
 |
Introduction to AutoCAD Civil 3D working environment |
 |
Creating and editing Survey Data |
 |
Importing Survey Data from
- Excel sheet
- Total Station
|
 |
Creating surface |
 |
Surface styles |
 |
Surface Analysis |
 |
Earthwork Calculation |
 |
Site Layout Design |
 |
Transportation Design |
 |
Material Takeoff |
 |
Pipe Layout |
 |
Plan Production and Printing |
 |
Data Structure and Reference Objects |
Key Topics (PPM Concepts)
 |
Instructions to Project Management |
 |
What is a Project? |
 |
What is Project Management? |
 |
Project Management Context |
| Processes of a Project Management |
 |
Initiation |
 |
Planning |
 |
Execution |
 |
Monitoring & Controlling |
 |
Closing |
| Knowledge areas in a Project |
 |
Time Management |
 |
Cost Management |
 |
Scope Management |
 |
Quality Management |
 |
Risk Management |
 |
Human Resource Management |
 |
Procurement Management |
 |
Integration Management |
 |
Communication Management |
|
Key Topics (Microsoft Office Project)
 |
Activities, Calendars - Definitions, Sequencing & estimate duration |
 |
How to develop a schedule plan and control |
 |
Network analysis-CPM, PERT, PDM |
 |
How to prepare Work Breakdown Structure (WBS) |
 |
How to define WBS |
 |
Constraints |
 |
How to manage cost in a project |
 |
How to do Resource Planning and Cost Estimation |
 |
How to prepare Resource Sheet |
 |
How to apply resource to each activity |
 |
How to define Resource Pool and to allocate Resources |
 |
Filters and Grouping |
 |
How Material Resources are being allocated |
 |
Analyzing Resources and Earned Value Analysis |
 |
Method of developing different types of reports according to industrial needs |
 |
Scheduling in multiple projects |
 |
Customisation |
|
Key Topics (Primavera)
| Defining Calendars |
| Project Portfolio Management |
| Defining the Enterprise Project Structure (EPS) |
| Defining Organisation Breakdown Structure (OBS) |
| Defining the Project Structure under the EPS |
| Activities – Definition, sequencing & Estimating duration |
| Effectively using the four types of PDM relationship |
| Scheduling the project |
| Defining constraints & overcoming conflicts |
| Defining & Assigning activity codes |
| Defining & assigning WBS codes |
| How to organize the activities by using activity Codes & WBS codes |
| Filtering activities |
| Defining and assigning Work products and Documents |
| Changing currency setting |
| Defining Roles |
| Defining Resources |
| Assigning by Roles |
| Assigning by resources |
| Estimating the cost of the project |
| How to analyse the resource by using resource profile & resource table |
| How to do resource leveling |
| Defining project codes and resource codes |
| Updating the project progress & comparing the actual progress with baseline |
| Analysing earned value management |
| Preparing different types of tabular reports according to the industrial needs |
| Preparing Graphical reports |
| Highlighting the progress in the bar chart |
| Application of Global change |
|
|
|